Before you specify
Frequently Asked Questions
What is the difference between the VK 12018 60.4+60.4 HP and the faster versions?
Only speed, installed power and, for the top drive, weight. All three press at 1,200 kN and make the same five-wire 1,100 x 1,100 mm bale. HSM gives this 90 kW version a 15.5 s idle cycle and 506 m³/h, against 11.3 s and 692 m³/h for the 55+55 kW press and 9.4 s and 837 m³/h for the 75+75 kW press.
How many tons per hour can the VK 12018 60.4+60.4 HP bale?
HSM rates it at 25.3 t/h on material with a bulk density of 50 kg/m³. That is a published figure under defined conditions, so real output depends on what you feed and how steadily it arrives. If your line sustains more than that, the 55+55 kW drive, with its 692 m³/h idle rating, is the next step.
How long and how heavy are VK 12018 bales?
The bale face is fixed at 1,100 x 1,100 mm (43.3 x 43.3 in), and length can be set from 600 to 2,000 mm. Weight runs from 700 to 1,100 kg (1,543 to 2,425 lb) depending on material, held by five wires. Moving bales of that size calls for a suitably rated forklift or bale clamp.
Why does the 60.4+60.4 HP VK 12018 weigh more than the 100.6+100.6 HP model?
Because its hydraulic and drive arrangement differs, not because the frame is larger. HSM lists both the 45+45 kW and 55+55 kW machines at 38,000 kg and the 75+75 kW machine at 36,000 kg, all in the same 12,413 x 4,159 x 3,622 mm frame. Plan foundations around 38,000 kg for this version.
Is the frequency-regulated VK 12018 worth considering?
Often, yes. HSM publishes a frequency-controlled 45+45 kW VK 12018 at a 10 second cycle and 786 m³/h, close to the fixed-speed 75+75 kW press, and states energy savings of around 40%. The option has to be specified when the machine is ordered, so compare payback against your power tariff before the order is placed.
Is baling wire included with the VK 12018?
No. The press ties five wires around every bale automatically, but wire is bought separately, and the right specification for your machine is confirmed at commissioning. On a press producing bales of up to 1,100 kg all shift, wire belongs in the operating budget from day one.