Before you specify
Frequently Asked Questions
How much cardboard does a 550 kg bale represent?
Roughly the contents of two to three standard 1100 litre waste containers of flattened cardboard, depending on how well it is loaded and how much air is in it. The practical effect is on collections: sites that were paying for several container lifts a week typically drop to a periodic bale collection, and the bales are sold rather than disposed of. That change in the waste contract is usually the largest part of the payback.
What ceiling height do I need?
The machine is 2985 mm tall, so a nominal 3 m ceiling is not enough once you allow working clearance above it and access to load the aperture. Plan on 3.3 m or more. If your building will not take that, the V-Press 825 plus at 2370 mm is 615 mm lower and still presses at 250 kN, and the 820 plus at 2499 mm is another option. Height is the single most common reason this machine gets rejected on site survey.
Does it use wire or tape?
Wire as standard, tied four-fold. At 550 kg a cardboard bale exerts considerable spring-back and wire is what reliably holds it. HSM offers a tape station as an option if you would rather run polyester strapping, which is what the smaller 820 and 825 models use as standard. Wire is a consumable and is not supplied with the machine.
Can it bale plastic film as well as cardboard?
Yes. HSM rates the 1160 for cardboard, plastic film and mixed paper. Film bales at a lower weight per bale than cardboard because it compresses differently, and mixing materials in one bale reduces what a recycler will pay, so most sites run separate campaigns rather than a mixed stream. The machine itself does not need reconfiguring between materials.
What power supply does it need?
480 V three-phase at 60 Hz, driving a 4.8 kW motor. That is a hard-wired connection made by an electrician before delivery. HSM's equivalent European article is a 4 kW machine at 400 V / 50 Hz; the higher figure here is the same motor running at 60 Hz rather than a different specification. Confirm your supply during the site survey, not on the delivery day.
How do I get a finished bale out of it?
With a forklift or a heavy pallet truck. A 550 kg bale is not a manual handling job under any circumstances, and the bay needs enough clear floor in front of the machine for a truck to approach, lift and turn. If the only handling equipment on site is a hand pallet truck on a sloped yard, that is a genuine reason to look at a smaller press instead.